Illustration of a teardrop pallet rack starter bay Two upright frames connected by beam pairs, with optional wire decking. Dimensions update as options are selected.

Illustration of a starter bay. Level count is representative, not a site-specific design.

New teardrop selective rack

Teardrop Pallet Rack Starter Bay

A standalone first bay of upright frames and beams, built to start a new run. Configure height, depth, and beam length, then request an itemized quote that includes freight.

Priced per layout

Get your quote: every part itemized, with freight to your ZIP. Nothing is ordered until you approve it.

144″ H × 42″ D × 96″ W · Starter bay

Frame height 144″
Frame depth 42″
Beam length 96″
Add wire decking Two decks per level on 96″ and 108″ beams; three per level on 144″ beams. Quoted with the kit; deck counts are illustrative.
Adder bays Each adder shares an upright with the bay beside it and cannot stand alone. Leave this at 0 for a starter only.
0
Starter bay kit includes: 2 upright frames and beam pairs for the illustrated levels. Anchors, protectors, and capacity plaques are quoted separately.

Submitting a request does not place an order or reserve inventory. Pricing, availability, and freight are confirmed in the written quote.

Starter bay vs adder bay

A starter stands on its own. An adder shares an upright with the bay beside it and cannot be used alone.

Start a new run

Starter bay

The first bay in a run. It includes two upright frames plus the beam pairs (and decks, if selected) that span between them.

  • Stands alone as a complete bay
  • Two-level example: 2 frames + 4 beams
  • Three-level example: 2 frames + 6 beams
Extend a compatible run

Adder bay

Used only to continue a run of compatible teardrop frames. It adds one upright and a matching set of beams (and decks, if selected).

  • Cannot stand alone
  • Two-level example: 1 frame + 4 beams
  • A six-bay two-level run is 7 frames, not 6 starters

If you are matching an existing system, send manufacturer or model information and clear photos of the frame connector and beam end. Do not mix components just because both are called teardrop, and do not climb loaded rack to take measurements.

Specifications

Frame height, depth, and beam length below follow the configuration you selected. Capacity, finish, and lead time are confirmed on your written quote for the exact components.

Frame height 144 in selected Selected
Frame depth 42 in selected Selected
Beam length 96 in usable beam length, not total run footprint Selected
Capacity per beam pair Confirmed on your quote from the manufacturer capacity chart for the exact beam, beam spacing, and decking. On quote
Finish Confirmed on your written quote. On quote
Lead time Confirmed on your written quote. On quote
Compatibility Teardrop connection pattern. Compatibility with another manufacturer’s teardrop frames or beams must be confirmed in writing before mixing.

Do not add beam-pair and deck ratings together to claim a level or system capacity. Changing the first beam elevation or vertical spacing changes frame capacity. All ratings must be revalidated against the approved chart before an order is accepted.

3 steps to size your racking

A useful quote starts with the load and the delivery site, not just the rack height. Send what you know; we will flag anything still needed.

Step 01

Measure the pallet and the load

Record pallet length, width, and height, any overhang, and the heaviest loaded weight you plan to store. Note how loads sit on the pallet — uniform decks and point loads are not the same.

Step 02

Choose bay depth, width, and height

Depth should clear the pallet and overhang. Beam length should fit the number of pallets per level plus side clearance. Height must cover pallet height, beam size, clearances, and the first beam elevation, under ceiling and sprinkler limits.

Step 03

Count bays and send your ZIP

Decide how many starter and adder bays you need, how many elevated levels, and whether you want wire decking. Include the delivery ZIP and whether a dock or forklift is available so freight can be quoted honestly.

This guide helps you gather project details. It is not a site-specific rack design. Safe capacity depends on the approved components, spacing, anchorage, slab, and applicable building, fire, and seismic requirements.

Installation & safety

Materials supply is not a site-specific rack design.

Installation should be performed by the buyer or a certified installer and must follow ANSI MH16.1 and any local permit, inspection, and engineering requirements for the actual site. A generic starter bay is not automatically permit-exempt or OSHA-certified.

Use the manufacturer’s instructions. Do not modify rack, substitute anchors, climb rack, or load an unapproved configuration. Have the manufacturer or a qualified rack professional confirm compatibility and any changes. Installation, stamped engineering, and permits are not included in a standard materials quote unless expressly agreed in writing.

Frequently asked questions

What is included in a starter bay?
A starter bay includes two upright frames and the beam pairs that connect them. If you add wire decking, the quote includes the correctly sized decks for each level. Anchors, column protection, row spacers, locks, and load plaques are listed separately so you can see exactly what is — and is not — in the materials package.
How is a starter bay different from an adder bay?
A starter bay can stand alone and begins a run. An adder bay adds one upright and another set of beams, sharing a frame with the previous bay. An adder cannot be used by itself. If you are extending an existing run, we need to confirm compatibility first.
Why aren’t prices shown on this page?
Pallet rack is configured and freight-heavy. A useful number includes the exact frames, beams, decks, freight to your ZIP, and any accessorial charges we know about. We confirm those in a written, itemized quote rather than posting a bay price that leaves freight or fit out of the picture.
Can I mix this with other teardrop racking?
Not automatically. “Teardrop” describes a connector style, not a guarantee that two manufacturers’ parts share the same ratings, hole spacing, or hook profile. Send photos and any model information you have, and do not mix components until compatibility is confirmed in writing.
Does the quote include installation?
No. Standard quotes cover materials and freight, with unloading, assembly, anchoring, permits, and engineering excluded unless a separate written scope says otherwise. Installation should follow ANSI MH16.1 and local permit requirements, and should be handled by the buyer or a certified installer.
How should I plan for freight?
Rack ships as long, heavy commercial freight. Before you approve an order, confirm that the site can receive it — typically with a dock or forklift. Do not assume a liftgate can handle long frames or beams. Residential, limited-access, or inside-delivery charges must be evaluated in advance and will appear on the quote when known.

Request a rack quote

Tell us what you need to store. Required fields are marked. A final quote still needs complete specifications, but you do not need a finished design just to inquire.

We will review the details and follow up about the next step. Pricing and freight are confirmed only in the written quote.