Short, direct answers about buying, sizing, shipping, and installing teardrop pallet racking from Rack Right. Don't see your question? Email steve@rack-right.com.
Buying and quotes
How much does pallet racking cost?
It depends on the sizes you need and freight to your ZIP, so we send a written quote within 24 hours instead of posting one price. The main cost drivers are frame height, frame depth, beam length, the number of beam levels, wire decking, how many bays you need, and freight. Tell us those details in a quote request and your quote will show everything, including freight.
How fast will I get my quote?
You'll get a written quote by email within 24 hours of sending your request. If something important is missing, we'll email you a quick question first.
What do you need from me for a quote?
Your ceiling height, pallet size, heaviest pallet weight, how many pallet positions you need, and your delivery ZIP. If you already know the frame height, depth, beam length, and number of bays and levels you want, include those too. If anything is missing, we'll ask.
Does a quote commit me to anything?
No. A quote request is not an order, and nothing is ordered or shipped until you approve your written quote.
Sizing and products
What is the difference between a starter bay and an adder bay?
A starter bay stands on its own; an adder bay attaches to it and shares one upright frame. A starter has two upright frames plus beams. An adder has one frame plus beams and connects to the bay before it. Every row begins with one starter, and each extra bay in that row is an adder.
What size pallet rack do I need for 48″ × 40″ pallets?
For standard 48″ × 40″ pallets loaded with the 48″ side going into the rack, a 42″-deep frame and a 96″ beam (two pallets per level) is the common setup. The Rack Manufacturers Institute says frames are typically 42″ or 44″ deep for a 48″-deep pallet, leaving 2–3″ of overhang front and back (RMI). Two 40″-wide pallets plus RMI's recommended side clearances fit within a 96″ beam. Confirm your actual pallet and load sizes before you order.
How much clearance do pallets need in a rack?
RMI recommends 3″ between the column and the load, 6″ between two loads on the same level, and 6″ between the top of a load and the beam above (RMI). Sprinklers need room too. Many guides cite 18″ below sprinkler heads (Cisco-Eagle), but your local fire code decides, so check with your fire marshal.
What sizes do you offer?
Our starter bay comes in frame heights of 96″, 120″, or 144″, frame depths of 36″, 42″, or 48″, and beam lengths of 96″, 108″, or 144″. Need a different size? Ask in your quote request.
How much weight can each level hold?
It depends on the beam size, beam spacing, and decking, and your quote confirms the rated capacity for your exact parts. Ratings come from the manufacturer's capacity chart. Never load racking beyond its posted load plaque.
What is teardrop pallet racking?
Teardrop racking is boltless selective pallet racking named for the teardrop-shaped holes punched in its upright frames. Beam end connectors hook into those holes and lock in place, so beam levels can be set or moved without bolting (Damotech).
Can I add to racking I already have?
Possibly, but confirm compatibility first. "Teardrop" describes a connection style, not a guarantee that parts from different manufacturers fit or share the same ratings. Send photos and any labels or model details, and don't mix components until compatibility is confirmed in writing.
Do you design warehouse layouts?
No, not at this time. Tell us the sizes and quantities you need, and we'll price them. For a full layout, a local rack professional or engineer can help.
Shipping, installation, and safety
How does racking ship?
By commercial freight to business addresses across the US. Freight cost to your ZIP and the expected lead time are confirmed on your quote. Plan for a loading dock or forklift to unload. See Shipping & Freight for details.
Do you install the racking?
No. We supply the racking, and you or a qualified installer handle installation. Follow the manufacturer's instructions and ANSI MH16.1, anchor as instructed, and post load plaques that match your setup (RMI).
Do I need a permit for pallet racking?
Often, especially for taller racking, but it depends on your city or county. For example, Sacramento's guideline requires no permit for racks under 5′9″, anchorage design from 5′9″ to 8′, complete rack engineering from 8′ to 12′, and high-piled storage fire code rules on top of that at 12′ and up (City of Sacramento). Check with your local building and fire departments before installing. This is general information, not legal advice.
Can I return racking?
Returns are handled case by case. See our Returns page for how it works.